
Welding and new energy lithium battery pack line equipment and technical service provider
Phone:+86-755-29915506 中文 | English
News
Contact us
Phone: +86-755-29915506
Fax: 0755-29915506
Email: selinla_508@qq.com
Head Office: Building 1, Baoshu Technology Industrial Park, Baotian, Xixiang Street, Baoan District, Shenzhen
Contact:
13713891301 (Mr. Zhang)
15220085680 (Manager Zhong)
13410992557 (Manager Chen)
News
How to maintain the spot welding machine daily?
- Time of issue:2021-06-21
How to maintain the spot welding machine daily?
(Summary description)How to maintain the spot welding machine daily?
- Time of issue:2021-06-21
- Views:
How to maintain the spot welding machine daily?
1. The compressed air used by the welding machine must be dry and should not contain moisture, otherwise it will damage the air circuit components of the machine.
2. Pay attention to the cleaning and maintenance of the welding electrode, do not stick to oil, iron filings and other sundries, and keep it clean and fresh.
3. Regularly check the air source processor, clean the filter frequently, and pay attention to the oil level of the oil mist device at any time, so that it is not less than half the height of the oil cup.
4. The welding machine should check the working condition of each bolt connection regularly (once a month), and tighten it if it is loose.
5. The secondary conductive contact part of the transformer should be cleaned regularly.
6. When the welding machine is short-circuited and stopped, the power supply of the control host must be cut off, and the intake valve must be closed. If there is a water cooling system, it must be closed accordingly.
7. When the welding machine stops working for a long time, the main power supply of the welding machine must be cut off. Water source and air source. When the temperature of the place where the welding machine is installed is very low, and it is possible to freeze the water, compressed air must be used to blow off the remaining water in the water cooling system to prevent icing from damaging the welding transformer and the thyristor.
8. When the welding machine is interrupted for a long time, it must be cleaned, kept properly, and checked and maintained frequently.
Shenzhen Site Technology Co., Ltd. is a high-tech production enterprise integrating R&D, production and sales of automated welding equipment and power battery PACK line equipment. The professional technical engineering team provides customers with timely and perfect pre-sales and after-sales services.
MORE NEWS
Contact
Tel:+86-755-29915506
Fax:+86-755-29915506
E-mail:selinla_508@qq.com
Add:Building 1, Baoshu science and Technology Industrial Park, Baotian, Xixiang street, Bao'an District, Shenzhen
Contact:0086 13713891301(Mr. Zhang) 0086 15220085680(Manager Zhong) 0086 13410992557(Manager Chen)
Yangzhou office: No. 330, Guoji lamps trading city, Gaoyou City, Yangzhou City, Jiangsu Province
Contact:0086 18012317032(Manager Chen)


Shenzhen Site Technology Co., Ltd. 粤ICP备16050825号 Powered by 300.cn